Mobile Home Setting

Print
Press Enter to show all options, press Tab go to next option

The following steps must be followed when bringing a manufactured home into a court or moving a home from one site to another:

  1. The manufactured home court will submit a site plan laying out the lot. This plan must include (at a minimum) the following items:
    1. Streets, alleys and sidewalks.
    2. Off street parking
    3. Home
    4. Other structures on the lot (decks, entrances, sheds, fences, garages, etc.)
    5. Distances (setbacks) between homes (and all other structures) and from the street
    6. Location of all utilities (electronic and gas meters)
    7. Location of LP tank (if applicable)
    8. Landscaping requirements
  2. Information must be submitted indicating the electrical service requirements of the home and service provided.
  3. Information must be submitted indicating the type of tie down construction.
  4. If the requirements included in steps 1-3 are met to the satisfaction of the Building Inspections Department, a building permit will be issued for a fee of $40.00. The permit fee must be paid at this time. The Building Inspections Department accepts cash or check.There is an additional minimal fee to process credit card
  5. All brand new homes must be installed by a North Dakota State licensed installer.

Grand Forks City Code Ordinance 18-0212: R-5 Mobile Home Residence District

 

 


Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Flash Player QuickTime Windows Media Player Microsoft Silverlight Word Viewer Excel Viewer PowerPoint Viewer